Reorder Math

Reorder list

Live demo with sample store data. About Reorder Math, plans and install

Suggestions, you decide. Read-only. Reorder Math only suggests — you decide. It never changes your products, inventory, or orders. Showing demo data (preview only).
Your Standard trial ends in 2 days (Nov 16). Your Standard plan continues as is. (sample)
Keeps your 4 suppliers' reorder dates and $1,372 freed. Plus about $4,735 from measured lead times in the last 30 days.
Stay on Standard
Order now (demo data)
Cash freed up: $1,372. Cash tied up in slow stock: $4,556 now vs $5,928 on Sep 15 (4 SKUs, at current unit cost).
About $232 of sales depends on these orders going out on time.
Send first (demo)
  1. 1. Today Summit Supply $232 at risk
  2. 2. Nov 17 Demo Second Due Co. on track
  • Summit Supply: order by today — about $232 of sales at retail price (some SKUs at unit cost) could be missed if this order is late (up to 6 days short)
  • Demo Second Due Co.: order by Nov 17 — on track if ordered by then
Estimates use each variant's current Shopify price where set; SKUs with no price use unit cost, so they understate lost sales. An estimate, not a guaranteed loss. Mark ordered saves only today's date.
· Summit Supply, Demo Second Due Co.. One all-day event per order-by date, built in your browser.

Migration: 2 of 4 suppliers ready — finish 2 →

Lead times updated this week (2 suppliers): covers about $2,766 more of sales during the wait; holds about $1,969 less stock.

2 suppliers have a measured lead time ready to use — longer ones cover about $2,766 more of sales; shorter ones hold about $2,030 less stock.

1 supplier due since your last visit — (preview)
Since your last visit (Nov 11, 3 days ago) (demo data)
  • 1 supplier now due or past due: Summit Supply.
  • 2 SKUs selling faster lately: Cotton Apron, Cork Coaster Set.
Based on your current data. We only keep the date you last opened the app.
Your cash this month (demo data)
  • $1,372 freed from slow stock by keeping reorder dates.

Last 30 days: 1 of 1 at-risk restock landed before the predicted run-out. No earlier history yet to compare. From your own PO-sent and received dates.

Orders sent on time: 1 of 2 due orders went out by the order-by date in the last 30 days, covering about $6,522 of sales at risk. From your PO-sent dates.

Lead times kept up to date (last 30 days, 2 suppliers): covers about $2,766 more of sales during the wait; holds about $1,969 less stock.

Keep this on Standard
What your trial has built so far (9 days left) (demo data)
  • 4 suppliers tracked.
  • 3 suppliers with a PO on record.
  • 6 POs prepared this trial.
  • First PO in 3 minutes.
  • $1,372 of slow stock sold down since you started.
Counted from data the app already has. Your measured lead times and history stay with your plan.
Selling faster lately (demo data)
  • Cotton Apron: 12/day over the last 14 days vs 6/day before (+100%) · about 21 days of stock at the recent pace. Order sooner
  • Cork Coaster Set: 12/day over the last 14 days vs 6/day before (+100%) · about 10 days of stock at the recent pace. Order sooner
Recent 14-day sells/day vs the days before, from stored daily sales. Reorder suggestions still use the normal sales window — check the SKU before ordering sooner. Shown here only; nothing is emailed.
Expected restock (demo data)
  • Atlas Textiles: PO sent Oct 11; expected about Nov 10 (30d set). No restock seen yet — check with supplier. Check with supplier
    Arrived on…
    Part arrived…
  • Northwind Goods: PO sent Nov 12; expected restock about Nov 26 (14d set).Usually late by about 4 days (2 arrivals in the last 30 days, vs 14-day lead time). (demo) Use 18 days (demo; Undo after)
  • Demo Freight Co.: PO sent Nov 5; expected restock about Nov 12 (demo).Usually late by about 4 days (2 arrivals in the last 30 days, vs 14-day lead time). (demo) Use 18 days (demo; Undo after) Still arriving? — about 2 days past If it came in, pick the real day (demo):If it arrived today: Lead time for Demo Freight Co. now about 9 days — update? Use 9 days (demo; Undo after)
    Arrived on…
    Part arrived…
  • Demo Sent Today Co.: PO sent today; expected restock about Nov 24 (demo).
Expected restock = the date you last downloaded or emailed a PO for that supplier in Reorder Math + its lead time (measured when we have it, otherwise the one you set). Restocks are read from daily inventory snapshots. If a delivery doesn't show up in inventory, use Mark received (or Arrived on… if it came in on an earlier day). Undo removes only the newest PO, part-arrived, or received date, if it was a mis-click. Marked it late? Use Received on… to set the real date (last 14 days) so lead times stay accurate. Split shipment? Part arrived… notes the first box and keeps the PO open; lead time and on-time % count it once the rest is marked in.
Your next reorder is due (demo data)
  • Atlas Textiles: due today — 3 SKUs (a PO is already on the way)
  • Northwind Goods: due today — 3 SKUs (a PO is already on the way)
  • Summit Supply: due today — 2 SKUs
  • Demo Second Due Co.: due Nov 17 (in 3 days) — 2 SKUs
  • Pacific Packaging Co.: due Nov 21 (in 7 days) — 1 SKU
Dates come from your lead times, review periods and recent sales. They move as sales change, so check back before each date. The file is built in your browser; nothing is emailed.
Reorder Math saved you an estimated $1,903 in cash this trial, plus 1 likely stockout avoided. (demo data)
  • Cash not tied up (Skip next order): $531 — 2 slow SKUs left out of suggested reorders, at unit cost. An estimate of stock you didn't buy, not cash banked.
  • Cash freed from slow stock: $1,372 — Drop in slow/dead stock value since your first inventory snapshot, at today's unit cost. A change in stock value, not cash in the bank.
  • Stockouts likely avoided: 1 of 1 — At-risk POs that restocked before the predicted run-out (from your PO dates and restocks seen). Likely, not certain.
  • POs built: 6 — 4 downloads, 2 email drafts opened in your mail app this trial. First PO in 3 minutes.
Since you started on Sep 15 (60 days): an estimated $1,903 in cash, 6 POs built. At this pace, about $952 a month (a projection, not a promise).
Estimates from your own data, not guaranteed savings. Built in your browser.
Weekly reorder digest (preview)
This week's suggested reorders: $6,717 across 9 SKUs from 3 suppliers.
Cash freed up: $1,372. Cash tied up in slow stock: $4,556 now vs $5,928 on Sep 15 (4 SKUs, at current unit cost).
Estimated lost revenue at risk from stockouts: $232 at retail price (unit cost for 1 SKU with no price) (2 order-now SKUs could run out up to 6 days before a restock ordered today arrives; leaves out 3 suppliers with a PO already on the way). Uses each variant's current Shopify price where set; cost-valued SKUs understate it — an estimate, not a guaranteed loss.
  • Atlas Textiles: $3,862 (4 SKUs)
  • Northwind Goods: $2,378 (3 SKUs)
  • Summit Supply: $477 (2 SKUs)
Shown here only — nothing is emailed.
Order now
8
Order this week
2
OK
22
No recent sales
2
Suggested spend (9 SKUs)
$6,717
PO CSV export — Standard plan
Status ▲ProductSupplierSells/dayDays of coverOrder bySuggested qtyEst. costWhy
Order nowLeather Keychain
RM-009
Northwind Goods1.78.2Nov 1437$252.34ROP 27 = 1.7/d × lead + 3 safety; have 14
Order nowOutCeramic Planter S
RM-011
Atlas Textiles5.90Nov 14233$2,700.47ROP 191 = 5.9/d × lead + 13 safety; have 0
Order nowCeramic Planter M
RM-012
Summit Supply5.59.1Nov 1496$198.72ROP 62 = 5.5/d × lead + 7 safety; have 50
Order nowWool Socks — L
RM-015
Atlas Textiles4.129.7Nov 1438$646.76ROP 132 = 4.1/d × lead + 8 safety; have 122
Order nowPocket Pencil Set
RM-017
Northwind Goods3.29.7Nov 1465$948.35ROP 51 = 3.2/d × lead + 6 safety; have 31
Order nowGlass Water Bottle
RM-019
Atlas Textiles2.931.5Nov 1423$210.68ROP 93 = 2.9/d × lead + 7 safety; have 90
Order nowBamboo Utensil Kit
RM-020
Summit Supply0.94.7Nov 1424$278.64ROP 11 = 0.9/d × lead + 2 safety; have 4
Order nowSeasonal Ornament
RM-029
Northwind Goods2.45Nov 1460$1,177.20ROP 38 = 2.4/d × lead + 4 safety; have 12
Multi-location reorder points & seasonality: coming soon on Pro.